top of page
buildingAdventureBG.jpg
Construction_Logo_White.png

BUILDING
ADVENTURE

The DRA Board of Directors announced it's approval of the first phase of the renovation and expansion plan for Q Casino.

withDRA.png

$80M+

Planned Investment

5

Phases

1

Amazing Adventure

Our 5 Main Phases of renovation and expansion.

Phase 1 - Temporary Casino

Remodel and connection of the former racing grandstand viewing area with the existing casino floor located in the upper grandstand building to create a temporary casino space.

AdobeStock_211594065.jpeg

Phase 2 -
Main Casino

Remodel of the existing lower casino and entertainment area, which will include an upgraded center bar with bar-top slot machines.

Phase 3 -

Family
Entertainment Area

Remodel of the temporary casino space into a permanent family entertainment zone for all ages.

Phase 4 -
New Hotel

Construction of a new hotel adjacent to the existing Hilton Garden Inn, complete with a rooftop restaurant.

Phase 5 -
Exterior Upgrades

Remodel of facility façade, new outdoor signage and improved landscaping and surface parking.

AdobeStock_70069310.jpeg
bg2_edited.png

 Get the Latest News & Updates

JOIN THE ADVENTURE!

Thanks for submitting!

QCR_Logo_Primary_Black.png

© 2024 by Q Casino + Resort. All rights reserved.

bottom of page